Metar & Taf

Decodificador visual

NOTAM F0614/24

Caducado
Mostrar en mapa
F0614/24 NOTAMN
Q) LFXX/QAFXX/IV/NBO/E /000/999/4412N00040E460
A) LFBB LFEE LFFF LFMM LFRR PART 1 OF 2 B) 2404250400 C) 2404260400
E) DUE TO AN INDUSTRIAL ACTION WITHIN AIR TRAFFIC CONTROL,
SIGNIFICANT
DISRUPTIONS ARE EXPECTED ACROSS ALL AIR TRAFFIC CONTROL SERVICES
(CRNA, APP, AND TOWER) OF DSNA IN MAINLAND FRANCE AND OVERSEAS
DEPARTMENTS.
A MINIMUM SERVICE IS GUARANTEED AT THE 5 EN-ROUTE CONTROL CENTERS
(ACCS) AND AT THE AIRPORTS IDENTIFIED IN THE DECREE N 85-1332
MODIFIED ON DECEMBER 17, 1985.
ACTUAL TRAFFIC FLOW CAPACITY WILL BE ADJUSTED BASED ON AVAILABLE
PERSONNEL.
RMK1: AIR OPERATORS MUST REDUCE THEIR COMMERCIAL FLIGHT SCHEDULES FOR
THE DAY OF APRIL 25, 2024, FROM 04:30 TO 22:00 UTC BY 65 PERCENT OF
THE INITIALLY SCHEDULED MOVEMENTS AT PARIS-CDG AIRPORT (LFPG) , FOR
THE DAY OF APRIL 25, 2024, FROM 04:00 TO 22:00 UTC BY 75 PERCENT OF
THE INITIALLY SCHEDULED MOVEMENTS AT PARIS-ORLY AIRPORT (LFPO), BY 65
PERCENT OF THE INITIALLY SCHEDULED MOVEMENTS AT MARSEILLE PROVENCE
AIRPORT (LFML), BY 60 PERCENT OF THE INITIALLY SCHEDULED MOVEMENTS AT
TOULOUSE BLAGNAC (LFBO) AND NICE COTE D'AZUR (LFMN) AIRPORTS, AND BY
PART 1 OF 2
F0614/24 NOTAMN
Q) LFXX/QAFXX/IV/NBO/E /000/999/4412N00040E460
A) LFBB LFEE LFFF LFMM LFRR PART 2 OF 2 B) 2404250400 C) 2404260400
E) 50 PERCENT OF THE INITIALLY SCHEDULED MOVEMENTS AT ALL OTHER AIRPORTS
WHERE ATC SERVICES ARE PROVIDED BY DSNA IN MAINLAND FRANCE. ATS
SERVICES WILL BE CLOSED FROM THE BEGINNING OF THE STRIKE UNTIL THE
END OF THE STRIKE AT LFBE LFBS LFBT LFCR LFKF LFLG LFLS LFMD LFMP
LFMT LFMU LFOB LFOK LFOT LFPE LFPX LFPZ LFQT LFRK LFRG LFRN AND LFTW
AND PART OF THE DAY AT LFBP LFBZ LFGJ LFLB LFLC LFMA LFMV LFPB LFOB
LFOP LFQQ LFRB AND LFSL.
PROPOSALS OF REVISED FLIGHT PROGRAMS FOR THURSDAY, APRIL 25, MUST BE
SUBMITTED BEFORE WEDNESDAY, APRIL 24, 09:00 UTC TO DGAC/DTA VIA EMAIL
AT: DTA-PROGRAMMES-CRISES-BF(AT)AVIATION-CIVILE.GOUV.FR.
RMK2: FLIGHTS ENSURING TERRITORIAL CONTINUITY OF FRANCE FOR THE
OVERSEAS DEPARTMENTS ARE EXEMPT FROM THESE RESTRICTIONS.
RMK3: AIRCRAFT OPERATORS MUST SYSTEMATICALLY CANCEL ALL PLN, RPL OR
FPL FOR THE FLIGHTS NOT OPERATED.
RMK4: REAL-TIME INFORMATION REGARDING THE SITUATION, INCLUDING ATS
SERVICE CLOSURES, WILL BE AVAILABLE ONLINE AT: HTTPS://CDM.DSNA.FR.
PLEASE REFER TO THE LIST OF AIRPORTS UNDER DSNA RESPONSIBILITY AND
THOSE WITH MINIMUM SERVICE IN THE CRISIS MESSAGES TAB.
RMK5: ADDITIONAL NOTAMS WILL BE ISSUED IF NECESSARY BASED ON THE
EVOLUTION OF THE SITUATION
PART 2 OF 2
FIR Marseille (LFMM)
Inicio 25 abr 2024 04:00 UTC
Fin 26 abr 2024 04:00 UTC
Tráfico IFR/VFR
Alcance En ruta
Finalidad Atención inmediata, PIB entry, Significant
Radio 460 NM
Emitido 23 abr 2024 20:31 UTC
Actualizado 23 abr 2024 20:32 UTC