Münster Osnabrück Airport

EDDG · Renania del Norte-Westfalia, Alemania

Última actualización el 4 de febrero de 2023 10:26.

Actualizar

NOTAM EDDG · Münster Osnabrück Airport

4 febrero 10:26 LT
2d
A0514/23  3 feb. 2023 10:10 LT
Actualizado
EDDG

RWY 07/25 CLSD DUE TO WIP. 08 FEB 21:50 2023 UNTIL 09 FEB 05:50 2023. CREATED:
03 FEB 10:10 2023

A0513/23  3 feb. 2023 10:09 LT
Actualizado
EDDG

TWY B BTN TWY C AND HOLDING POINT 07 CLSD DUE TO WIP. 08 FEB 21:55 2023 UNTIL
10 FEB 17:00 2023. CREATED: 03 FEB 10:09 2023

A0404/23  27 ene. 2023 10:24 LT
Actualizado
EDDG

MUENSTER/OSNABRUECK NDB MYN 371.00KHZ ON TEST. DO NOT USE, FALSE 
INDICATIONS POSS. 22 FEB 07:00 2023 UNTIL 22 FEB 13:00 2023. CREATED: 27 JAN
10:24 2023

A0319/23  23 ene. 2023 10:27 LT
Actualizado
EDDG

CHANGES TO SID DUE TO MAINT OF MYN NDB:
GPS/FMS RNAV OVERLAY REMAIN UNCHANGED.
RWY 07:
DOMEG3E, RKN2E AND OSN9E: AMEND DCT TO MYN (4.4 DME MOD) TO READ
CLIMB STRAIGHT AHEAD TO 4.4 DME MOD.
RKN2E ADD RMK: AFTER PSG 2000 BRNAV EQPT NECESSARY.
DOMEG2Y AND HMM3Y: AMEND CLIMB ON TR 070DEG INBD MYN NDB TO
600FT TO READ CLIMB STRAIGHT AHEAD TO 600.
REF AD 2 EDDG 5-7-1 EFF 02 APR 2015, 5-7-3 EFF 22 APR 2021.
RWY 25:
DOMEG2C, RKN1C AND OSN2C: AMEND CLIMB ON TR 250DEG MYN NDB TO
5.2 DME MOD TO READ CLIMB STRAIGHT AHEAD TO 5.2 DME MOD.
OSN9X, DOMEG2Z AND HMM1Z: AMEND CLIMB ON TR 250DEG MYN NDB TO
600 TO READ CLIMB STRAIGHT AHEAD TO 600.
REF AD 2 EDDG 5-7-1 EFF 02 APR 2015, 5-7-7 EFF 22 APR 2021. 22 FEB 07:00 2023
UNTIL 22 FEB 13:00 2023. CREATED: 23 JAN 10:27 2023

A0318/23  23 ene. 2023 10:21 LT
Actualizado
EDDG

CHANGES TO APCH PROC DUE TO MAINT OF MYN NDB:
NDB APCH RWY 07/25 TEMPO SUSPENDED.
REF AD 2 EDDG 4-4-1 DATED 01 DEC 2022, 4-4-2 BOTH EFF 22 APR 2021. 22 FEB 07:00
2023 UNTIL 22 FEB 13:00 2023. CREATED: 23 JAN 10:21 2023

A0238/23  18 ene. 2023 08:34 LT
Actualizado
EDDG

DUE TO INSUFFICIENT NAVAID COVERAGE OF HMM DVOR/DME THE FLW 
CHANGES TO STAR OCCUR:
BAMSU 2J ADD REMARK: BRNAV EQPT NECESSARY.
REF AD 2 EDDG 3-1-1 EFF 27 JUN 2013 AND 3-1-2 DATED 27 FEB 2020. 18 JAN 08:34
2023 UNTIL 18 APR 23:59 2023 ESTIMATED. CREATED: 18 JAN 08:34 2023

A0237/23  18 ene. 2023 08:05 LT
Actualizado
EDDG

RFFS DOWNGRADED TO CAT 5, CAT 9 AVBL ON REQ.
SKED TFC NOT AFFECTED.
SCHEDULE: 01-04 06-11 13-16 18 20-23 25 27-28 2301-0259. 01 FEB 23:01 2023 UNTIL
28 FEB 23:59 2023. CREATED: 18 JAN 08:05 2023

A1529/22  29 mar. 2022 09:21 LT
EDDG

TAXILANE TO/FROM NORTH OF RWY 07/25 LIMITED:
1. TWY WIDTH: 4M
2. ACFT MTOW: 2000KG
3. DAY ONLY
4. TORA RWY 07: 1280M
   TORA RWY 25: 890M. 29 MAR 09:21 2022 UNTIL PERM. CREATED: 29 MAR 09:21 2022

A1639/21  26 mar. 2021 14:03 LT
EDDG

DUE TO OUTAGE OF RKN VOR PART THE FLW CHANGES TO SID OCCUR:

GPS/FMS RNAV OVERLAYS REMAIN UNCHANGED.
AMEND RKN VOR/DME TO READ RKN DME.

RWY 07:
RKN 2E ADD REMARK: 
AFTER PASSING 2300 FT MSL BRNAV EQUIPMENT NECESSARY.

RWY 25:
RKN 1C AMEND ON R093 RKN TO READ ON TRACK 273 DEG. ADD PDG 5 PERCENT 
(300 FT/NM) UNTIL 3600 FT MSL. ADD REMARK: AFTER PASSING 2300 FT MSL 
BRNAV EQUIPMENT NECESSARY. 26 MAR 14:02 2021 UNTIL PERM. CREATED: 26 MAR 14:03
2021

Mostrando 1 - 9 de 9 items.

Nosotros y terceros seguimos tu comportamiento en Internet en nuestro sitio web con cookies. Si continúas, asumimos que estás de acuerdo con nuestra Política de cookies.